With a total area of 3.200 ha. upon completion, WHA Industrial Zone 1 - Nghe An will be the largest well-developed industrial zone in North Central Vietnam, connecting the new manufacturing and distribution base to serve domestic and international markets. Located within Dong Nam Economic Zone with special privileges, WHA Industrial Zone 1 - Nghe An Phase 1 offers 498 ha of international-standard infrastructure for industrial investors and also accommodates residential and commercial projects..
Geographical location
WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc District, Nghe An Province, Vietnam.
Soil conditions:
Modified Proctor Standard K90
Elevation above sea level:
2,5m - 2,7m above the mean sea level
Weather condition:
Tropical climate
How the big city and how much Km:
Distance to Central Province:
18km
How much nearest airport Km:
18 Km from Vinh International Airport
How much Railway Station Km:
17km from Vinh station
Distance to the nearest river port:
Nearest seaport how many km:
THE INFRASTRUCTURE
Traffic road
Internal Road structure:
• Main road 67 meter Right of Way (4 Lanes)
• Secondary Road 30 meters Right of Way (2 Lanes)
• Reinforced Concrete Road (25 cm. thickness) with LED Street Lighting system, for Energy Saving.
Electricity
• 22 kV Transmission Line installed along the Internal Road: Standard Supply Capacity : 250 KVA per hectare
• Cua Lo Substation (65 MVA)
Locating 6 km. from WHAIZ 1 - Nghe An
2 Dedicated Feeders Transmission Line to WHAIZ 1 - Nghe An
Source of Power: National Power Grid
• 110kV Transmission line expansion is available upon application to EVN.
Water
4,000m3 - 12,000m3 per day
Wastewater treatment
Natural Eco - Environmental friendly Treatment
• Primary Treatment : Aerated Lagoon (AL)
• Secondary Treatment : Constructed Wetland
• Treatment Capacity : 3,200 m3/day (Expandable to 9,600 m3/day)
Garbage disposal
Finance
Training School
Fire station: 24hrs/7days operation with Emergency Team stand by, locating next to Site office.
Housing for workers
Contact Information
Other add-ons
Acreage & Status quo
Planning area
2100 (ha)
Area available for rent
Smallest leasable area
5000 (m2)
Occupancy
Phase 1: 75% Phase 2: 22%
Cost
Land_lease
Land lease
Management fee
VND1,506/m2/month (excluded VAT
Electricity price
Peak hour 0.11 USD/kWh; Normal hours: 0.06 USD/kWh; Off-peak hour 0.04 USD/kWh
water price
VND 11,000/m3
Cost of wastewater treatment
Treatment cost (m3): 6,300 VND/ m3 (excluded VAT)
Solid waste disposal fee
Depends on local supplier
Favorable
Preferential corporate income tax
• The preferential tax rate of 10% for first 15 years.
• Tax exemption for 4 years, then followed by 50% reduction of payable tax amounts for 9 subsequent years.
Remarks: A tax holiday and tax reduction shall start from the first profit-making year or the fourth revenue-generation year whichever comes first.
Preferential import tax
• Exemption for machines and equipment to create fixed asset.
• Exemption for materials & components that cannot be produced domestically for 5 years.
VAT Deals
More deals
One Stop Service at Dong Nam Economic Zone Authority.