Thanh Loc IZ is located in Thanh Loc commune, Chau Thanh district, Kien Giang province; 6 km far from Rach Gia city center; 5 km from Rach Gia airport, 112 km from Can Tho Cai Cui seaport and 230 km from Ho Chi Minh city.
Thanh Loc Industrial Park is located on the southern coastal corridor, connecting 3 countries Vietnam, Cambodia and Thailand and connecting with Highway 80; the river way borders Cai San and Vanh Dai canal, convenient for transportation of goods.
Thanh Loc IZ has an area of 251.98 ha, is phased investment into 2 phases (phase 1: 151.98 ha and phase 2: 100 ha); planning associated with areas for worker houses and resettlement of 60.43 ha.
Currently, the occupancy rate of the industrial zone reaches 68% (phase 1).
Geographical location
Short description about the location of the IP (max 30 words): Thanh Loc Industrial Park is located on the southern coastal corridor, connecting 3 countries Vietnam, Cambodia and Thailand and connecting with Highway 80; the river way borders Cai San and Vanh Dai canal, convenient for transportation of goods.
Soil conditions:
Elevation above sea level:
Weather condition:
Tropical monsoon climate
How the big city and how much Km:
112 km from CanTho City
Distance to Central Province:
6 km from RachGia city
How much nearest airport Km:
5 km from RachGia airport
How much Railway Station Km:
230 km from HoChiMinh City
Distance to the nearest river port:
borders CaiSan canal and VanhDai canal.
Nearest seaport how many km:
112 km from CanTho City
THE INFRASTRUCTURE
Traffic road
The main road of the IZ is 38m wide, the road surface on each side is 7.5m, the median strip between the road is 3m. The investment in infrastructure in the IZ has been relatively complete: rain water drainage system; electric lighting system; gate, fence of the IZ; leveling and planting trees along the routes, ...
the IZ is continuing to construct the internal traffic system and a number of other infrastructure items, serving the activities of projects in the industrial park.
Electricity
National Power System (110KV, 220KV ...):
Water
5.000 m3/years (in IZ).
Wastewater treatment
Garbage disposal
Finance
Training School
Housing for workers
Contact Information
Telephone systems and high-speed Internet lines of the IZ are capable of meeting all requirements of investors, installed by VNPT Kien Giang Company
Other add-ons
Acreage & Status quo
Planning area
252 (ha)
Area available for rent
152 (ha)
+ Free area: 48.63 ha (phase 1), 100 ha (phase 2)
Smallest leasable area
15000 (m2)
Occupancy
68%
Cost
Land_lease
300 USD/m2
Rent cost: + 750,000 VND/m2/50 years, increase 10% for riverside locations.
Minimum lease term: 50 years
Minimum leasing area: 15,000 m2
Land lease
Management fee
Electricity price
Peak hours: 2,871 VND / kWh
Normal hours: 1,555 VND / kWh
Idle hours: 1,007 VND / kWh
water price
8,500 VND / m3
Cost of wastewater treatment
Solid waste disposal fee
Favorable
Preferential corporate income tax
Incomes of enterprises from performing new investment projects are entitled to corporate income tax rates and incentives as follows:
a) The preferential tax rate of 10% applies for a period of 15 years;
b) Tax exemption for 04 years and 50% reduction of payable tax amount for the next 9 years.
Preferential import tax
a) Goods imported to create fixed assets of projects in accordance with the law on investment.
b) Raw materials, supplies and components imported for: processing of export products; production of goods for export.
c) Raw materials, supplies and components that cannot be domestically produced and imported for production of an investment project in accordance with the law on investment.
VAT Deals
More deals