The industrial park is located in a convenient location connecting to the center of Hanoi city with highly qualified human resources.
Geographical location
Soil conditions:
K98 hill land
Elevation above sea level:
Average from 5 meters-20 meters
Weather condition:
Monsoon
How the big city and how much Km:
0
Distance to Central Province:
12 km
How much nearest airport Km:
45 km
How much Railway Station Km:
26 km
Distance to the nearest river port:
23 km
Nearest seaport how many km:
140 km
Traffic road
Main road system (width, number of lanes):
14 meters of road (excluding sidewalks) is divided into 2 lanes.
Internal road system (width, number of lanes):
10 meters (excluding sidewalks).
Electricity
220 Kv
Water
15.000 m3/day
Wastewater treatment
Standard: According to the standards in current law
Maximum treatment capacity (m3/day): 15.000m3/day
Current treatment capacity (m3/day): 10.000m3/day
Garbage disposal
Finance
Training School
Available
Housing for workers
Contact Information
Viettel
Other add-ons
Land_lease
150 USD/m2
Minimum lease term: 50 years
Minimum leasing area: 5000 m2
Land lease
2.5 USD/m2
Minimum lease term: 2 years
Minimum leasing area: 500 m2
Management fee
0,5USD/m2/years
Electricity price
Peak hours: 1.902 VNĐ/kWh
Normal hours: 1.007 VNĐ/kWh
Idle hours: 1.555 VNĐ/kWh
water price
10.500VNĐ/m3
Cost of wastewater treatment
Solid waste disposal fee
Under contract with collection and disposal unit
Preferential corporate income tax
In compliance with Government regulations
Preferential import tax
In compliance with Government regulations
VAT Deals
In compliance with Government regulations
More deals
In compliance with Government regulations