Tan Thuan Corporation (TTC) is a joint venture between IPC and CT&D - choosing Ho Chi Minh City - the center of the major cities in Asia to build the first EPZ and was voted the most successful EPZ in Vietnam.
Geographical location
Short description about the location of the IP: TTZ is located in District 7, Southeast corner of the center of Ho Chi Minh City, located on a peninsula surrounded by the Saigon River, total area: 300 ha.
Soil conditions:
Elevation above sea level:
1m8
Weather condition:
tropical sub-equatorial monsoon
How the big city and how much Km:
4 km
Distance to Central Province:
4 km
How much nearest airport Km:
13 km
How much Railway Station Km:
8 km
Distance to the nearest river port:
bên cạnh TTZ
Nearest seaport how many km:
Traffic road
Main road system (width, number of lanes): building line 42 – 60m, width 18m
Internal road system (width, number of lanes): building line 18m, width 8m
Electricity
National Power System 120 MV and can be increased
Water
Water volume (m3/day): 20,000 m3
Wastewater treatment
Standard: B to A
Maximum treatment capacity (m3/day): 15,000 m3
Current treatment capacity (m3/day): 15,000 m3
Garbage disposal
Finance
Training School
Takes only 3-5 minutes for fire engines to be present at the fire site in the area.
Housing for workers
Contact Information
Other add-ons
Planning area
300 (ha)
Area available for rent
41927 (ha)
+ Free area: 0 ha + Factory area: 41,927 m2 (SFD - F - G - H) + Office: 1,435.58 m2
Smallest leasable area
0 (m2)
Occupancy
Land_lease
Land lease
6.6 USD/m2
Rent cost: 6.5 – 8.5 USD/m2/month
Minimum lease term: 03 years
Minimum leasing area: 1,210 m2
Management fee
Depends on rental product
Electricity price
Peak hours: 3,076 VND/kW
Normal hours: 1,685 VND/kW
Idle hours: 1,100 VND/kW
Other information: The above price applies to the unit price of electricity produced (excluding 10% VAT).
water price
Water cost: 11,400 VND/m3
Other information: 5% tax
Treatment cost (m3): depends on the quantity and quality of wastewater
Cost of wastewater treatment
Treatment cost (m3): depends on the quantity and quality of wastewater
Input processing standards: B
Output processing standards: A
Solid waste disposal fee
Preferential corporate income tax
Except for special cases for Enterprises certified as high-tech enterprises – tax exemption for 4 years, 50% reduction for the next 9 years
Preferential import tax
VAT Deals
Import and export tax exemption for export processing enterprises.
More deals