Geographical location
The project is located in Chan May - Lang Co Economic Zone in Loc Tien Ward, Loc Vinh Ward, Thua Thien Hue Province, 710km to the North of Hanoi and 1000km to the South of Ho Chi Minh City.
Soil conditions:
Main Structure is fine sand
Elevation above sea level:
+ 3,20
Weather condition:
Tropical monsoon climate
How the big city and how much Km:
39 km from Danang city
Distance to Central Province:
To Hue Center: 59 km
How much nearest airport Km:
38 km to Da Nang International Airport, 42km from Phu Bai International Airport
How much Railway Station Km:
Distance to the nearest river port:
Nearest seaport how many km:
39 km from Danang city
Traffic road
The cross-section of the largest road is 36 m and the smallest road is 23.5 m.
Electricity
The national power grid (110KV) through the 110/22KV transformer station with the capacity of 2 x 40 MVA, the 22 KV medium voltage transmission line is installed along the internal roads in the SCINTZ.
Water
12,000 m3/day-night.
Wastewater treatment
Investors sign contracts with local companies owned by local government or private companies.
Garbage disposal
- The pipeline system is installed along the internal roads in the SCINTZ.
- The sewerage system has been installed along the internal roads in the SCINTZ.
- The wastewater treatment plant with a capacity for the First phase is 4,900 m3/day-night.
Finance
Training School
Housing for workers
Contact Information
Internet services are pre-installed, ready for businesses to connect and come into use
Other add-ons
Chan May seaport has petrol and oil depots with a capacity of 22,000 m3.
Planning area
162.1 (ha)
Area available for rent
(ha)
322.3 ha of which 255.69 ha is land for lease
Smallest leasable area
0 (m2)
Occupancy
Land_lease
60 USD/m2
The term of the land lease contract is signed until January 11th, 2078
Land lease
Management fee
0.55USD/m2 (exclusive of VAT)
Electricity price
- Voltage level from 6 KV to under 22 KV:
+ Normal hour: 1,729 VND
+ High hour: 3,194 VND
+ Low hour: 1,124 VND
- Voltage level under 6 KV:
+ Normal hour: 1,809 VND
+ High hour: 3,314 VND
+ L
water price
13,653 VND/m3 (exclusive of VAT). Depending on the applied time, the unit price is currently applied under Decision No.425/QD- XDCN dated August 26th, 2018 of HueWACO
Cost of wastewater treatment
Treatment cost (m3): 7,520 VND/m3 x K factor (1.0 ≤ K ≤ 4.5) (not including fee and tax) as to the prescribed price of the Waste Water-Treatment Plant in Chan May - Lang Co Economic Zone.
Solid waste disposal fee
Preferential corporate income tax
CIT is 10% for 15 years from the first year of turnover. Free for the first 04 years and 50% reduction for the next 09 years, calculated from the first year in which the enterprise has taxable income.
Preferential import tax
- Equipment imported, and machinery to create fixed assets of the project will be exempt from tax.
- For raw materials and materials imported for the production of export goods, which have already been paid import tax, they shall be refunded withholding tax corresponding to the import tax rates of the exported products (temporarily imported/ re-exported).
VAT Deals
More deals
Transparent, equitable business environment and simple administrative procedures
- The government of Thua Thien Hue Province has established and operated the Public Service Portal. The service is provided using Enterprise eCards so that businesses can easily access information and access administrative procedures.
- The time for granting investment registration and enterprise registration certificates and other administrative procedures shall be handled in a simple and quick manner in accordance with the state regulations.