Phuc Khanh II Industrial Park - A subdivision managed by Khai Phat Dai Tin Joint Stock Company is granted the Investment License No. 2295 / GP by December 30, 2002 and the amended Investment License No. 2295A. / GP on September 8, 2003. Up to now, the Industrial Park has completed synchronous technical infrastructure and has attracted 25 projects (secondary).
Geographical location
Located in Phu Xuan Commune, Phu Khanh Ward, Thai Binh City.
Boundary of detailed planning:
+ The North borders the rice fields of Phu Xuan commune
+ The South borders on the residential areas and enterprises along National Highway 10
+ Bordered by the Bach River and the field to the East.
+ West of city cemetery and field of Phu Xuan commune.
Soil conditions:
Elevation above sea level:
Weather condition:
How the big city and how much Km:
Distance to Central Province:
How much nearest airport Km:
How much Railway Station Km:
Distance to the nearest river port:
Nearest seaport how many km:
Traffic road
Main road system (width, number of lanes):
The road from National Highway 10 to the Industrial Park includes a main axis: The road is 16m (7 + 2 + 7) (there is a separating 2m in the middle to grow flowers and ornamental plants) .The sidewalk is 5m on each side, the cross section is 26m, ( 5 + 7 + 2 + 7 + 5).
Internal road system (width, number of lanes):
- West and North contour of Industrial Zone: Road No. 3, road bed 14 m, sidewalk on each side is 5 m, cross-section 24m (5 + 7 + 5).
- I
Electricity
National power system (110KV, 220KV ...): The electricity system is taken from the existing 35 KV grid running along the industrial park, building the power grid along the internal roads, from this grid system. will pull electricity to the company's own transformer station.
Water
1115m3.
Wastewater treatment
Standard: The standard of the output treatment is to reach value C column A QCVN 40: 2011 / BTNMT
Maximum treatment capacity (m3/day): 2000
Current treatment capacity (m3/day): 700-800 m3
Garbage disposal
Finance
Training School
Fire hydrant system is arranged at locations on the roads in the industrial zone.
Housing for workers
Contact Information
Underground optical cable system is directly connected to the fence of each enterprise
Other add-ons
Land_lease
55 USD/m2
Minimum lease term: 50 years
Minimum leasing area: Under an agreement with the industrial zone infrastructure investor
Land lease
Management fee
VND 460 / m2 / month
Electricity price
According to EVN regulations
water price
According to the price of Thai Binh Clean Water Joint Stock Company
Cost of wastewater treatment
Output processing standards: Pass QCVN 40: 2011 / BTNMT column A
Solid waste disposal fee
According to the unit price of the garbage disposal unit
Preferential corporate income tax
According to Government Regulations
Preferential import tax
According to Government Regulations
VAT Deals
According to Government Regulations
More deals
According to Government Regulations