Hoang Mai I Industrial Park was approved by the Prime Minister to orient the construction planning of Nam Thanh-Bac Nghe region and is one of the industrial parks recorded in the list of priority development zones (Investment License No. 272203200026).
This is a promising place which will generate favorable conditions to attract investment, form production ground for industrial and handicraft production establishments, and create jobs and income for the local labor force..
Geographical location
Hoang Mai I Industrial Park has a very convenient traffic location, from which it is easy to quickly access seaports, road ports and airports, thus saving plenty of transportation costs and time, especially the cost of importing and exporting goods.
Soil conditions:
Elevation above sea level:
7.2-11.5 m
Weather condition:
Tropical monsoon with 2 distinct seasons: summer and winter.
How the big city and how much Km:
200 km to Hanoi
Distance to Central Province:
75 km to Vinh city
How much nearest airport Km:
60 km to Vinh airport
How much Railway Station Km:
30 km to Yen Ly station
Distance to the nearest river port:
Nearest seaport how many km:
200 km to Hanoi
THE INFRASTRUCTURE
Traffic road
Central axis:
- Width: 46 m;
- Number of lanes: 08
Main axis:
- Width: 22.25 m
- Number of lanes: 04
Electricity
The power supply system includes 02 110KV substations with a capacity of 2x63MW each
Water
Water volume (m3/day): 80.000 – 120.000 m3/24h
Wastewater treatment
Factory standard: Output wastewater meets column A standards, QCVN 40:2011/BTNMT.
Maximum treatment capacity (m3/day): 12.800 m3/24h.
Current wastewater treatment capacity (m3/day): 6.400m3/24h, capable of treating up to 12.800 m3/24h.
Garbage disposal
Finance
Training School
Comply with fire protection regulations.
Housing for workers
Contact Information
All communication needs are guaranteed and capable of providing all necessary services such as private switchboard, international phone, teleconferencing, leased lines, high speed internet, email, etc.
Other add-ons
Acreage & Status quo
Planning area
264.8 (ha)
Area available for rent
Smallest leasable area
30000 (m2)
Occupancy
68%
Cost
Land_lease
USD/m2
0.06 USD/m2/year
Minimum rental term: 49 years (up until 2071)
Minimum rental area: 03 ha
Land lease
Management fee
0.05 USD/m2/month (annual payment)
Electricity price
- Peak hours: 3.076 VND/KWh = 0.13 USD
- Normal hours: 1.685 VND/KWh = 0.08 USD
- Off-peak hours: 1.100 VNĐ/KWh = 0.05 USD
water price
Clean water price: 0.45 USD/m3.
Other information: The price is calculated according to the regulations of the People's Committee of Nghe An province on the price of clean water.
Cost of wastewater treatment
0.25 – 0.85 USD/m3.
Solid waste disposal fee
Favorable
Preferential corporate income tax
Applying a tax rate of 10% in the first 15 years the business has revenue; tax exemption for 4 years; reduce 50% of tax payable for the next 9 years since the enterprise has taxable income.
Preferential import tax
Tax exemption for goods imported to create fixed assets. Tax exemption for 5 years for raw materials and semi-finished products that cannot be produced domestically but must be imported to serve the project.
VAT Deals
Applied differently to different professions: 0%, 5%, 10%.
More deals
Export tax incentives only for limited natural resources.