Hoa Hoi Industrial Park, Binh Dinh Province located in the Middle Central Region of Vietnam with synchronized infrastruc- ture systems, create the best support and services for investors
Geographical location
Hoa Hoi Industrial Park, Binh Dinh Province located in the Middle Central Region of Vietnam with synchronized infrastruc- ture systems, create the best support and services for investors
Soil conditions:
Good and solid
Elevation above sea level:
Weather condition:
The IP is located in the tropical monsoon climate zone
How the big city and how much Km:
36k far from Quy Nhon City
Distance to Central Province:
How much nearest airport Km:
8km far from Phu Cat Airport
How much Railway Station Km:
13km far from Dieu Tri Railway Station
Distance to the nearest river port:
Nearest seaport how many km:
36km far from Quy Nhon International Seaport
Traffic road
Main road system: 32m, 4 lanes; Internal road system: 25m, 2 lanes
Electricity
Power is supplied from the national grid through 110/22kv (35kv) transformer station with capaci- ty 63MVA. Supply enough electricity for enterprises when the demand increased.
Water
Water volume: Water supply plant will be operated with capacity of 6,800 m3/ day. Water supply capacity may increase to meet consumption demand of enterprises
Wastewater treatment
Standard: 4,800 m3/day.
Maximum treatment capacity: Wastewater treatment capacity may increase to meet consumption demand of enterprises.
Current treatment capacity: Wastewater processing plant will be run with capacity of first phase 1,200 m3/ day. Rainwater and wastewater drainage systems are separately built
Garbage disposal
Finance
Training School
Install sprinkler system along the internal roads in IP. Distance of installation: 150m-200m/fire extinguisher.
Housing for workers
Contact Information
The modern and international standardized telecommunication system is always available for communication demand, high and stable data transmission speed and domestic and local communication service
Other add-ons
Land_lease
USD/m2
Minimum lease term: whole leasing term
Land lease
Management fee
VND 7,000/m2/year (excluded VAT)
Electricity price
Peak hours: 2,871VND/kwh (From Monday to Saturday: 9:30 to 11:30; 17:00 to 20:00).
Normal hours: 1,864 VNĐ/kwh (From Monday to Saturday: 4:00 to 9:30; 11:30 to 17:00; 20:00 to 22:00/ Sunday: 4:00 to
water price
Water cost: VND 9,800/m3
Cost of wastewater treatment
Treatment cost: VND 10,000/m3
Input processing standards: B
Output processing standards: A
Solid waste disposal fee
Preferential corporate income tax
10% tax rate applied for a 15-year period, tax exemption for maximum first 4 years and reduction 50% for maximum 9 following years, from the first year of investment project in revenue
Preferential import tax
Free import duty for formation of fixed assets in investment projects in term of import duties.
Free import duty for materials imported for the production of commodities to be exported.
VAT Deals
0% for EPE
More deals
RAW LAND USE TAX: Exemption of raw land use tax in whole leasing period