+ Dong Hoi industrial park is located in Quynh Lap and Quynh Loc communes of Hoang Mai town, Nghe An province. The north side borders Xuoc mountain and Truong mountain. The south side borders Dong Tien rocky mountain. East sea borders the east side, while the west side borders Xuoc mountain and Hoang Mai town. Dong Hoi Industrial Park is about 20 km north of Cau Giat town, 1 km from Hoang Mai train station, adjacent to Nghi Son – Thanh Hoa deep-water port, 5 km from National Highway 1A and North-South railway, 80 km from Vinh airport and 75km from the synthesizing deep-water port in Cua Lo.
+ Dong Hoi industrial park in association with Dong Hoi seaport system has been approved by the Ministry of Transport in detail planning in Decision No. 838/QĐ-BGTVT dated April 28, 2011.
+ Nature and function: A multi-industry integrated industrial park, such as thermal power industry; thermoelectric auxiliary industry; cement industry; shipbuilding industry ferry; rope industry, cables, ropes and fishing gear production; wedge processing industry; mechanical repair industry.
Geographical location
Dong Hoi industrial park is located in Quynh Lap and Quynh Loc communes of Hoang Mai town, Nghe An province. The north side borders Xuoc mountain and Truong mountain. The south side borders Dong Tien rocky mountain. East sea borders the east side, while the west side borders Xuoc mountain and Hoang Mai town. Dong Hoi Industrial Park is about 20 km north of Cau Giat town, 1 km from Hoang Mai train station, adjacent to Nghi Son – Thanh Hoa deep-water port, 5 km from National Highway 1A and North-South railway, 80 km from Vinh airport and 75km from the synthesizing deep-water port in Cua Lo.
Soil conditions:
K 1.5-2.5
Elevation above sea level:
Weather condition:
How the big city and how much Km:
80 km from Vinh city
Distance to Central Province:
How much nearest airport Km:
75 km from Vinh airport
How much Railway Station Km:
Distance to the nearest river port:
Nearest seaport how many km:
12 km from Nghi Son seaport
THE INFRASTRUCTURE
Traffic road
+ Main road system: 43m; 4-6 lanes.
+ Internal transport system: The internal traffic network is completely designed, coherent, connected in accordance with the existing roads of the regional transportation network, internal roads with a width of 13m – 60m.
Electricity
National Power System (110KV, 220KV ...)
Water
Water volume (m3/day): 8000
Wastewater treatment
Standard: Level B (QCVN 40:2011/BTNMT)
Garbage disposal
Finance
Training School
Housing for workers
Contact Information
Internet: ADSL, fierber & telephone line
Other add-ons
Acreage & Status quo
Planning area
600 (ha)
Area available for rent
Smallest leasable area
0 (m2)
Occupancy
Cost
Land_lease
USD/m2
Rental cost: 30 – 50 USD.
Minimum lease term: 50 years.
Minimum leasing area: 1 ha.
Land lease
Management fee
0,2 USD/m2
Electricity price
+ Peak hours: 0,1 USD
+ Normal hours: 0,05 USD
+ Idle hours: 0,03 USD
water price
0,4 USD/m3
Cost of wastewater treatment
0,3 USD/m3
Solid waste disposal fee
Favorable
Preferential corporate income tax
Preferential import tax
VAT Deals
More deals
In addition to the privileges authoried by the Investment Law; Law on Enterprises, Law on Corporate Income Tax, Law on Import-Export Tax..., projects investing in Dong Hoi Industrial Park are also entitled to incentives of Nghe An province issued under Decision No. 02/2010/QĐ-UBND dated 07/01/2010 of Nghe An Provincial People's Committee.