Geographical location
Located in the area directly connected to Noi Bai – Hai Phong – Ha Long – Mong Cai highway with a length of 304 km, a scale of 4 lanes, a speed of 100km / h, easy access to the domestic market in the Red River Delta region and the southwest market of China.
Soil conditions:
Ready
Elevation above sea level:
+4.8m CD
Weather condition:
How the big city and how much Km:
100km to Hanoi
Distance to Central Province:
07 km
How much nearest airport Km:
04 km
How much Railway Station Km:
05 km
Distance to the nearest river port:
03 km
Nearest seaport how many km:
03 km
Traffic road
Spindle system (how many m wide, several lanes): The main trunk road in Deep C industrial park has a width of 68m; The branch roads in the industrial park have a width of 34m, of which the width of the roadway is 15 m (2 sides). The entire road system in the industrial park is arranged with lighting, trees, dividers and sidewalks to create synchronization.
Internal traffic system (how many m wide, several lanes):
Electricity
2 sources of national grid power and regional grid.
Water
40,000
Wastewater treatment
Factory standard: ISO
Maximum processing capacity (m3/day): 12,000
Current wastewater treatment capacity (m3/day): 5,000 VND
Garbage disposal
Finance
Training School
Housing for workers
Contact Information
Other add-ons
Planning area
3400 (ha)
Area available for rent
(ha)
+ Vacant land: 1,000 ha + Land with factory: 100 ha
Smallest leasable area
0 (m2)
Occupancy
50%
Land_lease
115 USD/m2
according to the validity period of the industrial park project
Land lease
USD/m2
Direct exchange when visiting the industrial park
Management fee
Electricity price
water price
Cost of wastewater treatment
Solid waste disposal fee
Preferential corporate income tax
Corporate income tax incentives: Average 4.35% in the first 15 years
Preferential import tax
VAT Deals
More deals