Geographical location
Dai An IZ located on 5 highway
Soil conditions:
Elevation above sea level:
Weather condition:
How the big city and how much Km:
50Km from Ha Noi, 50 km from Hai Phong port
Distance to Central Province:
How much nearest airport Km:
60 km from Noi Bai airport
How much Railway Station Km:
2 km from Cao xa station,
Distance to the nearest river port:
Nearest seaport how many km:
110 km from Quang Ninh.
Traffic road
Internal transportation system Industrial Complex is designed to ensure reasonable traffic throughout the industrial cluster is transparent. Road system was designed with dimensions as follows: - shaft in center large industrial zone 55 meters - The main street in 30 meters wide industrial cluster - The roads in the Industrial Branch 17.5 meters wide all the internal roads are designed and constructed to comply with strict regulations of the country, and finished with plastic Asphalt Beton. The
Electricity
Power supply are taken from the national grid. The line system will be developed into a grid along the roads.
Water
Hai Duong water company with 20.000m3 capacity. Water supply network to fence of each enterprise in accordance with international standard.
Wastewater treatment
Wastewater is treated to at B level before discharging into general sewage system of the Industrial zone. Then, IP will continue processing to standards prescribed by the Government of Vietnam. Solid wastes: plants in the industrial zone will sign the contract of sorting , collection and transportation of waste away from the IP to avoid polluting the environment.
Garbage disposal
The waste is collected and processed at the plant's waste Industrial Park.
Finance
Ocean bank
Training School
Dai An college university
Housing for workers
Dai An urban with 18.22 ha
Contact Information
Modern information technology system serves the needs of communications such as telephone, Internet, cable TV, etc..
Other add-ons
rain drainage and wastewater drainage systems, fire-fighting system, banks and ATM systems… in IP are quite good.- Over 13% of total area of IP is planted trees, along roads and other areas.
Land_lease
USD/m2
According to the Government's price set.
Land lease
Management fee
0.30 USD/m3/year
Electricity price
water price
Reference Price: About 100 - 400USD/person/month
Cost of wastewater treatment
0.22 USD/m3
Solid waste disposal fee
Under the provisions of the provincial People's Committee and the Management Board of Industrial Zones
Preferential corporate income tax
IP has a convenient location, along Highway 15, linking the northern key economic zones.- Good infrastructure system, full auxiliary services - vacant land with large area.
Preferential import tax
High rents. High operating costs. High labor costs
VAT Deals
Compliance with various types of investment. With the location of IZ concentration, so IZ can use available services and has the high investment linked. Good support policies for investment activities
More deals
Environmental remediation. High labour attracting policies.