Tay Ninh

Contact
Mr. Nguyen Manh Hung -Director
84.91838384
Evaluation of investment environment
Consider investing in real estate is nearby Long Hau HCMC , Duc Hoa 1 Industrial Zone Xuyen , Duc Hoa Industrial Zone 3 is the preferred choice of foreign companies wishing to set office .. . Mr. Pham Vu Luan >> Detail
Map
Department of Planning and Investment Tay Ninh
Address: No. 300, Cach Mang Thang Tam Street, Ward 2, Tay Ninh Town, Tay Ninh Province
Phone: (0663).822166
Fax:
Email:
Website: sokhdt.tayninh.gov.vn/Pages/default.aspx
The priority areas: Tourism , Industry - Construction , Services , Agriculture - forestry - fishery

Geographical location: Tay Ninh belongs to the west pole of Southeast region. Geographic coordinates 100 58'28 '' to 110 46'39 '' North latitude and from 1050 48'21 '' to 30'00 1060 'East longitude. The boundaries are limited as follows: + The East side faces to 2 provinces Binh Duong and Binh Phuoc. + The South side faces to Ho Chi Minh City and Long An province. It is far away from Ho Chi Minh City to Northwest side about 99km along with the Highway 22 and from Hanoi Capital about 1809km along Highway 1. + The west side and the north side face to the Cambodia Kingdom (including of 03 provinces: Svay Rieng, Prayveng and Tbong Khmum), there is a 240km long border line.

Acreage: 4032.61

Population: 1,111,503

Topographic: The terrain is inclined towards northeast-southwest; the average elevation of North side has 10-15m (especially away 10km from Tay Ninh City, Black Virgin (Ba Den) mountain is an only mountain with 968m high altitude in the province); Southern terrain is characterized plain with an average altitude of 3-5m. Overall, the flat terrain is relatively favorable for development of agriculture, industry and infrastructure

Administrative units: 01 city (Tay Ninh), 08 districts, including Hoa Thanh, Duong Minh Chau, Tan Chau, Tan Bien, Chau Thanh, Go Dau, Trang Bang, Ben Cau.

Natural resources: + Land resources: there are 5 main types of soil namely 344.928 hectares of gray soil groups, accounted for 85,63%; 25.359 hectares of alum soil group, accounted for 6,3%; 6,850 hectares of barren soil group, accounted for 1,7%; 1.775 hectares of alluvial soils, accounted for 44%; peat soils buried 1.072 ha, accounted for 0,27%. + Water Resources: (1) surface water mainly depends on the operating mode of two major rivers that flow through the province including Saigon River and Vam Co Dong River. Dau Tieng Lake is built on the upper reaches of the Saigon River, is one of the largest irrigation canal with an effective capacity of 1.5 billion m3 (27,000 ha); (2) ground water is widely distributed in the province, a large flow, good quality, with the ability to supply for whole daily life and production. + Mineral resources: it is basically non-metal group such as 16 million tons peat reserves; 100 million tons limestone reserves; 10 million m3 pebbles, sand and gravel reserves; 16 million m3 clay reserves; 4million m3 lateritic stone reserves, 1300-1400 million m3 building stone reserves. + Forest resources: natural forest is specifically distributed on Lo Go-Xa Mat national administrative forest (SPECIALLY USED FOREST) and the Chang Riec cultural and historical forest. According to the Statistical Yearbook 2014, the specially used forest is 31.725,36 hectares, accounted for 7.85%; Land use forest (protective forests) 26.779 hectares (6.63%) and land cover forest71.962,87 ha (17.81%).

Travel resources: Data typing update!

Human resources: Data typing update!

Traffic: + Roads: The total length of road is 8186.6 km. * Highway is 02 routes: Highway 22 (Trans-Asia road), Highway 22B; 111.56 km length BTN under the standard of road II, III * The name and street number of highway: there are 40 routes with total length of road is 759.0 km. 1/. ĐT.781: 59km long, beginning at the gate of Phuoc Tan (Km26 + 00) and ending at the Saigon Bridge (Bình Dương boundary). 2/. ĐT.782: 26,8Km long, beginning at The Bank three-way junction of Trang Bang downtown, ending at Tamarind three-way junction (in junction with ĐT.789). 3/. ĐT.783: 13,1Km long, beginning at the Thiện Ngôn three-way junction (in junction with Highway 22B) and ending at Lò Gò three-way junction (in junction with ĐT.788 and ĐT.791). 4/. ĐT.784: 24,514Km long, beginning at the Bàu Đồn three-way junction (in junction with ĐT.782), ending at the Bàu Năng three-way junction. 5/. ĐT.784 extension: 9,2Km long, beginning at the Bàu Cốp three-way junction (in junction with ĐT.784), ending at ĐT.785. 6/. ĐT.785: 46.2 Km long, beginning at the Cầu Quan (Tây Ninh City) intersection (in junction with ĐT.781), and ending at the Ka Tum (Tân Châu district) three-way junction (in junction with ĐT.794). 7/. ĐT.786: 32,65Km long, beginning at the Km0+00 in junction with Trung Nu Vuong Street and ending at the Mộc Bài intersection. 8/. ĐT.786nd: 12,5Km long, beginning at the Km0 + 00 of the Mộc Bài and Highway 22 intersection, ending at the Km 12+500 in the Đường Xuồng Bridge on Long An boundary. 9/. ĐT.787A: 5,15Km long, beginning at the Chợ Mới and Highway 22 three-way junction, ending at Long An provincial boundaries. 10/. ĐT.787B: 15 Km long, beginning at the Km0+00 in the Hai Chau intersection (Trans-Asia traffic bypass) and ending at the Km15 + 00 in Bùng Binh three-way junction (in junction with ĐT.789). 11/. ĐT.788: 31,2Km long, beginning at the Vịnh three-way junction (in junction with QL.22B), ending at the Lò Gò three-way junction (in junction with ĐT.783 and ĐT.791). 12/. ĐT.789: 27Km long, beginning at the boundary of Cu Chi and HCM City, ending at the 33 Bridge (in junction with ĐT.781). 13/. ĐT.790: 10,637Km long, beginning at the Pedagogy College three-way junction, ending at Suối Đá-Khe Dol Road. 14/. ĐT.791: 35,6Km long, beginning at the Lo Go three-way junction (in junction with ĐT.783 and ĐT.788), ending at the Xa Mat three-way junction (in junction with Highway 22B). 15/. ĐT.792: 70,4Km long, beginning at the point in junction with Highway 22B of the Xa Mat three-way junction, ending at the Cần Lê Bridge (bordering with Binh Phuoc boundary). 16/. ĐT.793: 39,987Km long, beginning at the intersection of Tan Binh (in junction with ĐT.785), ending at the point in junction with ĐT.792. 17/. ĐT.794: 34.9 Km long, beginning at the point in junction with ĐT.785 of Ka Tum three-way junction, ending at the Saigon Bridge 1, Binh Phuoc boundary. 18/. ĐT.795: 17,9Km long, beginning at the point in junction with Highway 22B of the Thanh Tây three-way junction, ending at the Đông Pal and ĐT.785 intersection. 19/. ĐT.795.1 (Đ. Tân Châu-Tân Thành): 19,8Km long, beginning at the point in junction with ĐT.785 of the Đồng Pal intersection, ending at the Tân Thành Commune. 20/. ĐT.795.2: 9km long, beginning at ĐT.795.1, ending at ĐH.16- Suối Ngô Commune, Tân Châu District. 21/. ĐT.796: 14,3Km long, bitumen surface, 6m wide, 9m background. Beginning at the point in junction with ĐT.781 of the Bến Sỏi intersection, ending at the point in junction with ĐT.786 of the Long Vĩnh. 22/. ĐT.797: 7,2Km long, beginning at the point in junction with Lý Thường Kiệt Street, ending at the Giang Tân three-way junction (in junction with Highway 22B). 23/. ĐT.798: 6,7Km long, beginning at the point in junction with ĐT.785, ending at Highway 22B. 24/. ĐT.799: 12km long, beginning at the point in junction with ĐT.790, ending at Highway 22B. 25/. Suối Đá-Khe Dol Street: 7.1 km long, beginning at the point in junction with ĐT.785, ending at the ĐT.781

Power system: + 02 substations of 220 / 110kV: Trang Bang station, 2x250 MVA capacity; Tay Ninh station, 1x250 MVA capacity. + 10 substations of 110 / 22kV, the total installed capacity of 835 MVA. + 02 substations of 110 kV transformer station 02 used for the production manufacture. + Power price: impose to the Decision No. 2256 / QD-BCT dated 12/03/2015 of the Ministry of Industry and Trade about electricity prices. + The installation and repair services: the local electricity sectors run under Government regulations.

Water system: + Tay Ninh Water Supply Plant (Tay Ninh city), capacity of 18,000 m3 / day; + Ben Cau Water Supply Plant (Ben Cau district) capacity of 2,800 m3 / day; + The urban water supply center (Go Dau Trang Bang, Hoa Thanh, Chau Thanh), capacity of 7550 m3 / day; + The water plants, water supply centers are at Industrial Park (IPs) and Export Processing Zone (EPZs) (Trang Bang, Linh Trung III, Thanh Thanh Cong, Phuoc Dong, Cha La) and in the industrial clusters (Ben Keo, Tan Hoi 1), capacity of 44,000 m3 / day. + Satisfy 100% of the urban population’s purified water needs and meet 100% of the industrial zone - Disposal system (water) waste: + For waste: * There are 04 waste treatment plants * Capacity of 524.6 tons / day * Meet 100% for industrial zones and residential areas. + For wastewater: * There are 06 factories and sewage treatment systems. * Power 43.600m3 / day. * Meet 100% for industrial zones and residential areas.

Post and Telecommunication Systems: Data typing update!

Systems Industrial Zone: 1. List of Industrial Parks (IPs): Trang Bang Industrial Parks : Company Name: TAY NINH JOINT STOCK INDUSTRIAL DEVELOPMENT INFRASTRUCTURE Company. Address: 12, Trang Bang Industrial Park, An Tinh Commune, Trang Bang district, Tay Ninh province. Phone: 066 3882728 Hotline: 0911 34 46 46 Fax: 066 3882307 Email: info@inde.vn Website: www.inde.vn 2. Linh Trung EPZ & IP III Company Name: LTD Sepzone - Linh Trung (VIETNAM) Address: EXPORT PROCESSING ZONES AND INDUSTRIAL Linh Trung III, An Tinh Commune, Trang Bang district, Tay Ninh province Phone: 896 600 0663. - 0663.896601 Fax: 896 391 0663. Web: www.linhtrungepz.com. Email: linhtrungepz@linhtrungepz.com 3. THANH THANH CONG INDUSTRIAL PARK: Company Name: JOINT STOCK INDUSTRIAL PARK THANH THANH CONG Company. Address: An Hoi Hamlet, An Hoa Commune, Trang Bang District, Tay Ninh Province Phone: (+84 66) 388 66 88 Fax: (+84 66) 388 68 68 Web: www.ttciz.com.vn Email: dep-ceo.sales@ttciz.com.vn 4. PHUOC DONG INDUSTRIAL PARK Company Name: JOINT STOCK & INVESTMENT SAIGON VRG Company Address: DT 782, Phuoc Dong, Go Dau District, Tay Ninh Province Phone: 08 3847 9273 Fax: 08 3847 9272 Website: saigonvrg.com.vn Email: info@saigonvrg.com.vn 5. CHA LA INDUSTRIAL PARK: Company Name: LTD INTERNATIONAL INVESTMENT Company Address: Cha La Industrial Park, Binh Linh hamlet, Cha La commune, Duong Minh Chau District, Tay Ninh Province. Phone: 0663.777.999 - 0931.24.8868 Fax: 0663.7770.770 Website: www.iid.com.vn - kcnchala.com.vn Email: chala@iid.com.vn - kcnchala@gmail.com 6. DAI AN SAIGON INDUSTRIAL PARK: Company name: DAI AN SAIGON JOINT STOCK COMPANY Address: 143 Hoa Lan, Ward 2, Phu Nhuan District, Ho Chi Minh City Tel: 08 3517 4686 Fax: 08 3517 4681 Email: info@daiansaigon.com 7. TMTC INDUSTRIAL PARK: Company Name: LTD INDUSTRIAL DEVELOPMENT TMTC. Address: Thuan Dong Hamlet, Loi Thuan Commune, Ben Cau District, under the economic zone of Moc Bai border gate in Tay Ninh province. VP: No. 8, 9A Street, Bien Hoa II Industrial Zone, Bien Hoa city, Dong Nai province. Phone: 061.3836421 ~ 30 ( Project department) Fax: 061.3836435 E-mail: - Mr Na Young Sik: ys.na@tk.t2group.co.kr - Mr. Park Jeong Jun: jj.park@tk.t2group.co.kr - Ms Pham Ngoc Nhu Y: pnn.y@tk.t2group.co.kr

The economic structure:


Growth Rate of Gross Domestic Product GRDP (At Constant 2010 Price):
(Source: Tây Ninh Statistical Yearbook 2015)

Year

2011

2012

2013

2014

2015

Total GRDP (Bill dongs)

31.922,6

35.020,68

38.024,35

42.154,67

46.480,14

Development Index (%)

12,47

9,70

8,58

10,86

10,26


GRDP per capita (unit: USD)

Year

2011

2012

2013

2014

2015

GRDP (per capita)

1.865

2.013

2.147

2.358

2.530

Development Index (%)

   -

7,94

6,64

9,83

7,29


Economy Structure (at current prices)

Year

2011

2012

2013

2014

2015

Agro-Forestry-Fishing

43,64

36,21

32,23

28,24

25,73

Manufacturing-Construction

25,32

29,0

31,68

35,23

37,67

Services

30,84

34,61

35,98

36,40

36,29


Turnover (value) of import-export

Year

2011

2012

2013

2014

2015

Export (Mill USD)

1.220,241

1.573,376

1.801,504

2.177,227

2.720,080

Import  (Mill USD)

857,250

890,176

1.215,133

1.533,797

1.969,050


Domestic Investment in 2015


+ Number of projects: 33 projects, Total registered capital: 1.355,43 billion dongs
+ Accumulative number of projects in 2015: 366 projects; Total registered capital: 36.225,5 billion dongs.

Foreign Direct Investment in 2015

+ Number of projects: 17, Total registered capital: 3.462,75 million USD 
+ Accumulative number of projects in 2015: 235 projects; Total registered capital: 3.462,75 million USD.

Growth:


Data typing update!

Attracting investment:


Data typing update!
- Priority and encouraging Fields: According to Appendix I - List of incentive investable careers is issued together at Decree No. 118/2015 / ND-CP of the Government dated 12/11/2015 that is assigned and guided to implement some articles of the Investment Law.

- Priority and encouraging Areas: According to Appendix II - List of incentive investable areas is issued together at Decree No. 118/2015 / ND-CP of the Government dated 11/12/2015.


 Preferential policies, investment support

There are General incentive investments for projects inside and outside Industrial Parks (IPs), Industrial clusters (ICs)

+ The related legal documents:

* Incentives for corporate income tax: According to regulation of the Income Tax Law on Corporate dated 03/6/2008 and amending and supplementing some articles of the Income Tax Law Corporate dated 06.19.2013; The Decree No. 218/2015 / ND-CP dated 12/26/2013 provides detailed regulations and guidelines for implementation of the Income Tax Law on Corporate; The Decree No.12/2015 / ND-CP dated 02/12/2015 assigns detailed implementation of the Amended and Supplemented Law on some articles of the Tax Law  and amends and supplements some articles of the  Tax Decrees and other related documents.

* Tax incentives for export, import duties: According to the Law on Export and Import Duties dated 06/4/2016; Decree No. 134/2016 / ND-CP dated 01/9/2016 assigns some detailed articles and implementation method of the Export, Import Duties Law and related documents.

* Land incentives: According to the Decree No. 46/2014 / ND-CP dated 05/15/2014 assigns to collect land rents and water surface rents and related documents.

* Policy of Local Government: Resolution No. 25/2016 / NQ-HDND (Councils) dated 09.22.2016 of the provincial People's Council provides specific policies to encourage enterprises to invest in agriculture and rural development of Tay Ninh province in 2016-2020.

Main contact for supporting to local investment

+ Name: Bui Cong Son - Director
+ Position: Director of the Department of Planning & Investment
+ Phone: 066.3827638
+ Address: 300, Cach Mang Thang Tam Street, Ward 2, Tay Ninh city, Tay Ninh Province
+ Email: sokhdt@tayninh.gov.vn
+ Website: www.sokhdt.tayninh.gov.vn
+ Other Contact Information:
* Board Management of Economic Zones:
+ Address: 215, 30/4, Ward 2, Tay Ninh city, Tay Ninh Province
+ Representative: Mr. Kieu Cong Minh - Director
+ Phone: 066.3922215
+ Website: www.taniza.vn
+ Email: kieucongminh@gmail.com

Investor Review

 

Send
Không có bình luận nào
Photo library
Industrial Park
Life in Vietnam
Vietnam maps showing administrative units, sources of critical raw materials and industrial zones locations.