Dong Nam Industrial Park is located in Cu Chi District, Ho Chi Minh City is developed by Sai Gon VRG Investment Corporation. Dong Nam Industrial Park has a total area of 342 hectares, currently only available for lease in the form of leasing ready-built factory/warehouse with an area starting from 1000m2.
Geographical location
Dong Nam Industrial Park is located in a strategic position on Provincial Road 8 (TL8), which is the connecting point between the center of Ho Chi Minh City (2 km) and Thu Dau Mot city, Binh Duong province (05 km).
Soil conditions:
Elevation above sea level:
0.7 km
Weather condition:
Tropical monsoon sub-equatorial
How the big city and how much Km:
05 km to Thu Dau Mot city, Binh Duong
Distance to Central Province:
20 km to Ho Chi Minh city center
How much nearest airport Km:
24 km to Tan Son Nhat airport
How much Railway Station Km:
24 km from Saigon Station
Distance to the nearest river port:
Nearest seaport how many km:
05 km to Thu Dau Mot city, Binh Duong
Traffic road
Main road system: 12 – 14m
Internal road system: 8 – 12m
Electricity
From on-site substation, total capacity 3 x 63 MVA
Water
Water volume: 10,000 m3/day
Wastewater treatment
Standard: Column B;
Maximum treatment capacity: 8,500 m3/day;
Current treatment capacity: 8,500 m3/day
Garbage disposal
Finance
Training School
Have fire alarm system
Housing for workers
Contact Information
Other add-ons
Planning area
342 (ha)
Area available for rent
(ha)
1,000 m2 of Factory lease
Smallest leasable area
200000 (m2)
Occupancy
95%
Land_lease
USD/m2
Please contact the industrial park developer
Land lease
5 USD/m2
Rent cost: from 5 USD/m2/month (VAT not included);
Minimum lease term: From 3 years;
Minimum leasing area: 1,000 m2
Management fee
Electricity price
Peak hours: 3,076 VND/kW;
Normal hours: 1,685 VND/kW;
Idle hours: 1,100 VND/kW;
Other information: Please contact the industrial park developer
water price
0.59/USD/m³/month
Cost of wastewater treatment
0.405 USD/m³/month
Solid waste disposal fee
Preferential corporate income tax
First 2 years exemption, next 4 years 50% reduction
Preferential import tax
VAT Deals
More deals